Send Message
Suzhou Drimaker Machinery Technology Co., Ltd

Drimaker Machinery, Your Drink Manufacturer!

Home
Products
Videos
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsWater Bottling Machine

3.8kw 5l Water Bottling Machine Rotary 3 In 1 Stainless Steel Material

3.8kw 5l Water Bottling Machine Rotary 3 In 1 Stainless Steel Material

  • 3.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material
  • 3.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material
  • 3.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material
  • 3.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material
3.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material
Product Details:
Place of Origin: Zhangjiagang city
Brand Name: DMK
Model Number: CGF12-12-5
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Standard export packing
Delivery Time: 40 working days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 100 sets per year
Contact Now
Detailed Product Description
Name: Bottle Water Bottling Machine Capacity: 1500 Bottles Per Hour(5000ml Bottle)
Material: Stainless Steel Power: 3.8KW
Weight: 4000KG Size: (L*W*H)2800*2200*2400mm
Function: Rinsing Filling Capping 3 In 1 Rinsing Head: 12 Heads
High Light:

water production machine

,

water bottle plant machine

5l Bottle Water Bottling Machine Rotary 3 In 1 Big Bottle Filling Machine

 

Water bottling machine description:

 

This machine mainly is designed for large volume bottled water like 5L, 7L....etc. On the basis of the 3-in-1 small bottle water filling machine, it is much improved, which integrates bottle washing, filling and sealing, and is not used in the traditional straight-line filling method for large bottles. It improves the degree of automation, reduces the floor area, reduces the number of people operating, and reduces the labor cost.

 

In order to ensure the smooth operation of large bottles in the rotary three-in-one filling machine, the punch clamp, filling valve and pressure cap are specially customized, and considering the large volume of large bottles, the weight after filling is heavy, the filling base is increased, and a set of nylon bottle protection system is set up to ensure the stable operation of the whole machine.

 

Water bottling machine working steps:

 

1. Empty bottles are deliverd into filling machine by conveyor, because big bottle is not suitable for air conveyor, with flat conveyor would be more stable.

 

2. There is a bottle holder on the rotary table of the bottling machine. Hold the bottle and turn it 180 degrees to make the bottle face down. The rinsed bottle is then transferred to the filling machine.

 

3. The bottle entering the filling machine is stuck by the bottleneck plate to make it rise, and the filling valve is pushed open by the bottle mouth. After the completion of filling, enter the capping machine.

 

4. The capping machine shall first stabilize the bottle and keep the bottle in an upright position, and then the capping head shall rotate and rotate on the capping machine. After the above steps are completed, it is delivered from the filling equipment.

 

5. Host adopt advanced PLC automatic control technology.

 

Water bottling machine parameters:

 

No Item Detail
1 Model CGF 12-12-5
2 Suitable bottle volume 5L-10L
3 Capacity 1500BPH(5l BOTTLE)
4 Machine weight About 4000KG
5 Machine size L*W*H 2800*2200*2400
6 Material SUS304
7 Machine control PLC+ Touch screen

 

After sale arrangement: 

 

1. Equipment installation and debugging:

After the equipment is delivered to the customer's workshop, the customer shall position the equipment according to the floor plan provided. The company shall send experienced technicians to guide the installation, debugging and trial production of the equipment, and reach the design capacity within the planned time. The installation and debugging time shall be 20 days, during which the company shall be responsible for providing corresponding spare parts and accessories.

 

2. Training

1. The company is responsible for providing technical training to the buyer. The training includes equipment structure and maintenance, equipment control and operation. Training will be conducted on site by the buyer. The company will assign qualified technical personnel to guide and develop the training program.

 

2, through training, the buyer's technical personnel can master the relevant operation and maintenance skills, more skilled in adjusting the process, timely deal with all kinds of faults.

 

3.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material 03.8kw 5l Water Bottling Machine  Rotary 3 In 1  Stainless Steel Material 1

 

Thanks!

For more information please contact us!

 

Contact Details
Suzhou Drimaker Machinery Technology Co., Ltd

Contact Person: Mr. Jerry Wu

Tel: 86-18606249106

Send your inquiry directly to us (0 / 3000)

Other Products